The interests of Madhya Pradesh’s water needs have been carefully considered in this project. The total water usage in the Tapti Basin Mega Recharge Project will be 31.13 TMC , with 11.76 TMC allocated to MP and 19.36 TMC to Maharashtra. The project will utilise 3,362 hectares of land in Madhya Pradesh, with no displacement of villages and no need for rehabilitation. The project will provide permanent irrigation facilities to 1,23,082 hectares in Madhya Pradesh and 2,34,706 hectares in Maharashtra.Initially, a traditional reservoir project of 66 TMC capacity was proposed, which would have affected over 17,000 hectares of land, including forest areas and tiger reserves, and displaced around 14,000 people across 73 villages. The earlier model has now been replaced with a groundwater recharge-based approach, avoiding displacement and environmental impact.“Today is a historic day as both states have agreed to implement the project conceptualised a long time back. Even the Inter-State Control Board meeting happened after 25 years,” Fadnavis said. “Both states will benefit from the implementation of the project, with Maharashtra’s three districts Budhana, Akola and Amravati, which have long been facing the problem of salty water, will be the major beneficiaries. This will help agriculture, drinking water and boost the overall economy of the two neighbouring states,” he said.CM Yadav said, “The implementation of the project will boost the entire economy of the Nimar (southwestern MP) region.”
Source link