Top Stories

Environment Ministry approves reconstruction of Kedarnath’s Rambara-Garudchatti pedestrian road-


Express News Service

DEHRADUN: The Ministry of Environment, Forest and Climate Change has granted final approval for the transfer of forest land, to rebuild the Rambara-Garudchatti pedestrian road, which was destroyed in the 2013 Kedarnath disaster.

After the calamity, a new route was established on the opposite side of the Mandakini river, but after a decade of effort, the state government has restored the original route by transferring 0.983 hectares of forest land for the construction of a pedestrian road spanning approximately 6.750 to 12.10 kilometers from Rambara to Garud Chatti.

Minister of Forests Subodh Uniyal told , “The Uttarakhand State Wildlife Board and the National Wildlife Board have already approved the land transfer for the construction of this road.” Accordingly, 0.983 hectares of forest land has been transferred for the construction of a pedestrian road spanning approximately 6.750 to 12.10 kilometers from Rambara to Garud Chatti.

Principal Chief Conservator of Forests and Nodal Officer, Ranjan Mishra, confirmed that “The central government approved the proposal from the Forest Department in July this year. Subsequently, the state government submitted a modified mitigation plan in September, which has now received approval from the central government.”

This restoration will significantly reduce the walking distance to Kedarnath Dham by two to two and a half kilometres. A three-kilometre pedestrian route from Garurchatti to Kedarnath was already finalized in 2017. Follow channel on WhatsApp

DEHRADUN: The Ministry of Environment, Forest and Climate Change has granted final approval for the transfer of forest land, to rebuild the Rambara-Garudchatti pedestrian road, which was destroyed in the 2013 Kedarnath disaster.

After the calamity, a new route was established on the opposite side of the Mandakini river, but after a decade of effort, the state government has restored the original route by transferring 0.983 hectares of forest land for the construction of a pedestrian road spanning approximately 6.750 to 12.10 kilometers from Rambara to Garud Chatti.

Minister of Forests Subodh Uniyal told , “The Uttarakhand State Wildlife Board and the National Wildlife Board have already approved the land transfer for the construction of this road.” Accordingly, 0.983 hectares of forest land has been transferred for the construction of a pedestrian road spanning approximately 6.750 to 12.10 kilometers from Rambara to Garud Chatti.googletag.cmd.push(function() {googletag.display(‘div-gpt-ad-8052921-2’); });

Principal Chief Conservator of Forests and Nodal Officer, Ranjan Mishra, confirmed that “The central government approved the proposal from the Forest Department in July this year. Subsequently, the state government submitted a modified mitigation plan in September, which has now received approval from the central government.”

This restoration will significantly reduce the walking distance to Kedarnath Dham by two to two and a half kilometres. A three-kilometre pedestrian route from Garurchatti to Kedarnath was already finalized in 2017. Follow channel on WhatsApp



Source link

You Missed

Virtusa Foundation Restores Ranglal Kunta Lake in Hyderabad’s Financial District
Top StoriesNov 5, 2025

विर्टसा फाउंडेशन ने हैदराबाद के वित्तीय जिले में रंगलाल कुंटा झील को बहाल किया

हैदराबाद: विर्टूसा कॉर्पोरेशन, एक प्रमुख उत्पाद और प्लेटफ़ॉर्म इंजीनियरिंग सेवाएं प्रदान करने वाली कंपनी, अपने फ़िलांथ्रोपिक हिस्से विर्टूसा…

Centre withdraws notice to dissolve Panjab University Senate and Syndicate
Top StoriesNov 5, 2025

केंद्र ने पंजाब विश्वविद्यालय की सीनेट और सिंडिकेट को भंग करने के लिए नोटिस वापस लिया

पंजाब विश्वविद्यालय के छात्रों की चिंताओं को ध्यान में रखते हुए, मंत्रालय ने विश्वविद्यालय प्रशासन के साथ इस…

On eve of Bihar polls, Rahul Gandhi drops 'H files,' alleges major 'vote theft' in Haryana Assembly elections
Top StoriesNov 5, 2025

बिहार चुनाव से पहले राहुल गांधी ने ‘एच फाइल्स’ को ड्रॉप किया, हरियाणा चुनाव में 25 लाख से अधिक वोटों की चोरी का आरोप लगाया

यदि मतदाता सूची खराब है और हमें अंतिम समय पर यह दी जाती है, तो इसका कोई अर्थ…

Uttarakhand Assembly’s special session on 25-year journey adjourned amid heated exchanges
Top StoriesNov 5, 2025

उत्तराखंड विधानसभा की विशेष सत्र में 25 साल की यात्रा पर चर्चा के दौरान हुई गर्मागर्म बहस के बीच समाप्त हुआ।

उत्तराखंड विधानसभा की विशेष बैठक, जिसमें राज्य के 25 वर्षों के विकास यात्रा और भविष्य के रोडमैप पर…

Scroll to Top